Project Summary At a prominent confectionery site in York, Newsome has implemented a efficient 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts cooling reliability while cutting overall power consumption and CO₂ discharge. https://greatbookmarking.com/story20750197/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction