In the beginning, the Jai Hind metro station was prepared to get elevated. Nonetheless, the AAI objected which the elevated stretch up towards the airport could possibly pose a risk to plane, Therefore the route was further more reworked along with the station was shifted underground, a hundred and fifty m https://waltere421pdr5.wikibestproducts.com/user