The 1st park features a ability of two hundred MW even though Sandrini II incorporates a ability of one hundred MW. The entire expense of each projects were not disclosed having said that, for the duration of construction, about two hundred workers were being utilized. The jobs are predicted to https://topcaliforniasolarcompanies.blogspot.com/2024/09/what-you-must-do-before-solar-roofing.html