Before you decide to presume the induce has long been located, double check with both the thermal imager and multimeter or clamp meter existing measurements. BIS is incorporating ECCN 2E910 on the CCL to regulate “engineering”, not specified in other places, “specifically intended” or modified to the “advancement” or “generation” https://yesbookmarks.com/story18130848/the-basic-principles-of-electrical-inspection