The scope of labor would require the east driveway to generally be shut with the period of construction which is predicted to conclude early March 2021. Ambulance traffic will proceed to own use of the FSED through the west driveway on East Bay Push. Scott's responsiveness meant minimum inconvenience for https://issuu.com/rjmurphyconsca